| Konsultan Hukum | 555.000.000 | Tumbuan & Partners | Tender Terbatas |
| Notaris | 99.345.000 | Ashoya Ratam | Tender Terbatas |
| Percetakan | 150.960.000 | Global Fokus Karyatama | Tender Terbatas |
| Renewal Autodesk AEC Collection (1 year) | 3.919.188.000 | PT SINERGI WAHANA GEMILANG | Tender Terbatas |
| Renewal Autodesk AEC Collection Trade-in (1 year) | 2.749.248.000 | PT EDPMEDIA MULTIMITRA PRIMANUSA | Tender Terbatas |
| Autodesk AEC Collection New Subscription (1 year) | 192.862.500 | PT SINERGI WAHANA GEMILANG | Tender Terbatas |
| Reneweal Autodesk AutoCAD LT (1 year) | 329.059.500 | PT EDPMEDIA MULTIMITRA PRIMANUSA | Tender Terbatas |
| Autodesk AutoCAD LT New Subscription (1 year) | 93.506.400 | PT SINERGI WAHANA GEMILANG | Tender Terbatas |
| JASA MANAGED OPERATION SAP - ADHI | 1.228.770.000 | PT SIGMA CIPTA CARAKA | Tender Terbatas |
| Pengadaan Jasa Audit Resertifikasi Audit SNI ISO 9001, 45001 dan 14001 | 194.250.000 | PT TUV NORD Indonesia | Tender Terbatas |
| Konsultan RJPP | 6.549.000.000 | Price Water House Cooper | Tender Terbatas |
| Pengembangan Aplikasi Whistle Blowing System (WBS) External | 46.620.000 | Teknologi Aplikasi Sejahtera | Tender Terbatas |
| Pengadaan Paket Microsoft Office E1 - Visio - Power BI - 365 Apps ( 21 Juli 2024 new ) | 1.338.549.000 | Multipolar Technology | Tender Terbatas |
| Pengembangan Aplikasi Audit Management System | 266.400.000 | PT. Tri Nindya Utama | Tender Terbatas |
| Asesmen Risk Maturity Index (RMI) PT Adhi Karya (Persero) Tbk. | 257.520.000 | CV. KAP Heliantono dan Rekan | Tender Terbatas |
| HVAC System Manyar Smelter Project - Steel Structure Works Area B (18-01-2024) | 815.850.000 | PT Catur Mitra Teknologi | Tender Terbatas |
| Power Construction Proyek Pusri IIIB - 17-01-2024 | 1.276.500.000 | PT. Matrix Jaya Unggul | Tender Terbatas |
| Construction 20kV Panel Proyek Pusri IIIB - 01-02-2024 | 582.750.000 | PT. Berkah Cipta Persada | Tender Terbatas |
| STEEL STRUCTURE FABRICATION PROYEK PLTMG SUMBAWA 2 - 15-12-2023 | 8.073.862.500 | PT Duta Hita Jaya | Tender Terbatas |
| STEEL STRUCTURE SUPPLY PROYEK PLTMG TOBELO - 15-12-2023 | 7.220.994.000 | PT Duta Hita Jaya | Tender Terbatas |
| WATER TREATMENT PLANT PROYEK PLTMG SUMBAWA 2 - 26-01-2024 | 1.332.000.000 | PT. Catur Prima Tehnik | Tender Terbatas |
| WATER TREATMENT PLANT PROYEK PLTMG TOBELO - 26-01-2024 | 1.509.600.000 | PT. Catur Prima Tehnik | Tender Terbatas |
| Construction Cable - Retender Proyek Pusri IIIB - 19-02-2024 | 1.134.125.850 | PT Multi Kencana Niagatama | Tender Terbatas |
| GAS METERING PACKAGE PROYEK PLTMG SUMBAWA 2 - 19-02-2024 | 6.521.250.000 | PT. Ultra Delta Maju | Tender Terbatas |
| GAS METERING PACKAGE PROYEK PLTMG TOBELO - 19-02-2024 | 6.687.750.000 | PT. Ultra Delta Maju | Tender Terbatas |
| HV APPARATUS & SAS PROYEK PLTMG TOBELO - 27-02-2024 | 19.497.150.000 | PT. Hitachi Sakti Energy Indonesia | Tender Terbatas |
| FIRE PROTECTION SYSTEM PROYEK PLTMG SUMBAWA 2 - 05-02-2024 | 8.214.000.000 | PT. Saberindo Pacific | Tender Terbatas |
| FIRE PROTECTION SYSTEM PROYEK PLTMG TOBELO - 23-02-2024 | 8.325.000.000 | PT. Saberindo Pacific | Tender Terbatas |
| FIRE PUMP PROYEK PLTMG SUMBAWA 2 - 20-03-2024 | 1.720.500.000 | PT. KSB Indonesia | Tender Terbatas |
| FIRE PUMP PROYEK PLTMG TOBELO - 20-03-2024 | 1.720.500.000 | PT. KSB Indonesia | Tender Terbatas |
| SPUN PILE SUPPLY PROYEK PLTMG TOBELO - 14-03-2024 | 8.736.132.456 | PT WIJAYA KARYA BETON, Tbk | Tender Terbatas |
| SPUN PILE DRIVING PROYEK PLTMG TOBELO - 14-03-2024 | 21.439.605.600 | PT BERDIKARI PONDASI PERKASA, Tbk | Tender Terbatas |
| AUXILIARY TRANSFORMER PROYEK PLTMG SUMBAWA 2 - 18-12-2023 | 2.193.360.000 | PT. Symphos Electric | Tender Terbatas |
| 150KV SWITCHYARD PACKAGE PROYEK PLTMG SUMBAWA 2 - 21-12-23 | 19.258.500.000 | PT. Siemens Energy Indonesia | Tender Terbatas |
| INSURANCE CAR PROYEK PLTMG TOBELO - 05-03-2024 | 1.165.500.000 | PT AON Indonesia | Tender Terbatas |
| INSURANCE CAR PROYEK PLTMG SUMBAWA 2 - 05-03-2024 | 1.054.500.000 | PT AON Indonesia | Tender Terbatas |
| GROUP AUXILIARY TRANSFORMER - ONAN ONLY COOLING RETENDER PROYEK PLTMG TOBELO - 08-03-2023 | 2.193.360.000 | PT. Symphos Electric | Tender Terbatas |
| ROOFING & SIDING SUPPLY AND INSTAL PROYEK PLTMG SUMBAWA 2 - 08-03-2024 | 8.135.190.000 | PT Sunemas Perkasa | Tender Terbatas |
| ROOFING & SIDING SUPPLY AND INSTAL PROYEK PLTMG TOBELO - 08-03-2024 | 8.469.300.000 | PT Sunemas Perkasa | Tender Terbatas |
| TRANSPORTATION OF PC SPUN PILE PROYEK PLTMG TOBELO - 22-04-2024 | 4.494.390.000 | PT Total Movements International | Tender Terbatas |
| Laydowns Electrical Cable Proyek Pusri IIIB - 22-05-2024 | 387.125.051 | PT LSAG Cable Indonesia | Tender Terbatas |
| Laydown 1 Temporary Proyek Pusri IIIB - 05-07-2024 | 1.326.450.000 | PT Resvara Balawan Prakasa | Tender Terbatas |
| TANK & VESSEL PROYEK PLTMG TOBELO - 27-05-2024 | 12.154.500.000 | PT Hydroraya Adhi Perkasa | Tender Terbatas |
| TANK & VESSEL FABRICATION & ERECTION PROYEK PLTMG SUMBAWA 2 - 27-05-2024 | 9.934.500.000 | PT Hydroraya Adhi Perkasa | Tender Terbatas |
| TANK & VESSEL PLATE SUPPLY PROYEK PLTMG SUMBAWA 2 - 29-05-2024 | 2.766.171.368 | PT Krakatau Steel | Tender Terbatas |
| MATERIAL TANK & VESSEL PROYEK PLTMG TOBELO - 29-05-2024 | 3.010.395.612 | PT Krakatau Steel | Tender Terbatas |
| EMERGENCY DIESEL GENERATOR PROYEK PLTMG SUMBAWA 2 - 21-06-2024 | 632.700.000 | PT Arbas Mitra Sejati | Tender Terbatas |
| BLACK START DEISEL GENERATOR PROYEK PLTMG TOBELO - 21-06-2024 | 632.700.000 | PT Arbas Mitra Sejati | Tender Terbatas |
| METALIC VALVES PROYEK PLTMG SUMBAWA 2 - 25-06-2024 | 610.500.000 | PT Sinar Surya Timur Teknik | Tender Terbatas |
| METALIC VALVES PROYEK PLTMG TOBELO - 24-06-2024 | 810.300.000 | PT Sinar Surya Timur Teknik | Tender Terbatas |
| SUPPLY ELECTRICAL CABLE PROYEK PLTMG TOBELO - 24-06-2024 | 2.580.545.760 | PT Jembo Cable Indonesia | Tender Terbatas |
| SUPPLY ELECTRICAL CABLE PROYEK PLTMG SUMBAWA 2 - 25-06-2024 | 3.725.106.720 | PT Multi Kencana Niagatama | Tender Terbatas |
| AIR COMPRESSOR PACKAGE PROYEK PLTMG SUMBAWA 2 - 08-07-2024 | 2.450.880.000 | PT Petrotec Air Powe | Tender Terbatas |
| AIR COMPRESSOR PACKAGE PROYEK PLTMG TOBELO - 08-07-2024 | 2.595.180.000 | PT Petrotec Air Powe | Tender Terbatas |
| TELCOM SYSTEM (VoIP,LAN,PA,INTERCOM, RADIO&CCTV) PROYEK PLTMG SUMBAWA 2 - 24-06-2024 | 4.708.620.000 | PT Megayasa Teknologi Indonesia | Tender Terbatas |
| TELCOM SYSTEM (VoIP,LAN,PA,INTERCOM, RADIO&CCTV) PROYEK PLTMG TOBELO - 24-06-2024 | 3.903.870.000 | PT Megayasa Teknologi Indonesia | Tender Terbatas |
| Material Plate (Carbon Steel) Proyek Pusri IIIB - 05-07-2024 | 2.968.575.876 | PT Krakatau Steel (Persero) | Tender Terbatas |
| Concrete Supply Proyek Pusri IIIB - 25-01-2024 | 36.420.531.212 | PT Varia usaha beton | Tender Terbatas |
| Pekerjaan Parapet MB )+600 & MB 0+675 Proyek Tol Sigli Banda Aceh | 642.172.413 | Miska Cipta Mandiri, PT | Tender Terbatas |
| PEKERJAAN MARKA JALA TIPE A PEMBANGUNAN JALAN TOL BAYUNG LENCIR - TEMPINO SEKSI 1 | 2.662.230.283 | CV. CITRA SANDHYA | Tender Terbatas |
| Pekerjaan Box Underpass STA 8+429 Proyek Tol Sigli - Banda Aceh | 1.772.527.365 | CV. PRASETIA JAYA | Tender Terbatas |
| Pekerjaan Geomat dan Vegetasi Taplok Proyek Tol Sigli - Banda Aceh Seksi 1A | 7.948.219.380 | PT. GEOSINTETIK REKAYASA KONSTRUKSI | Tender Terbatas |
| Pekerjaan Geomat dan Vegetasi Taplok Proyek Tol Sigli - Banda Aceh Seksi 1B | 6.743.574.120 | PT. GEOSINTETIK REKAYASA KONSTRUKSI | Tender Terbatas |
| Pekerjaan Atap | 11.433.000.000 | PT. Anugerah wijayatrisna | Tender Terbatas |
| Pekerjaan Elektrikal Proyek PLN Depok & Ungaran | 6.876.450.000 | PT SURYA ELEKTRINDO SWASTIKA | Tender Terbatas |
| Pekerjaan Sistem Keamanan Proyek PLN Depok & Ungaran | 7.770.000.000 | PT TETRASETIA INDONESIA | Tender Terbatas |
| Pekerjaan Secondary Skin Proyek BDK Denpasar | 1.343.889.632 | PT NATUNA CEMERLANG | Tender Terbatas |
| Pekerjaan BAS Proyek PLN Depok & Ungaran | 4.440.000.000 | PT INTISAR SOLUZINDO | Tender Terbatas |