INFORMASI TAHAP PERENCANAAN 2025
1Rencana umum pengadaan Tahun 2025Selengkapnya
2Pengadaan yang telah selesai lelang
A. Pengadaan Stainless Steel Pipe Proyek EPCC Jetty dan Propylene Storage Tank Plant BalonganSelengkapnya
B. Pengadaan Readymix Concrete Proyek Integrated Oncology Building Dr. Mohammad Hoesin PalembangSelengkapnya

Info Lelang

Nama PaketDepartemenJadwalSampai DenganStatus Penawaran
Pengadaan Panel Tegangan Rendah dan Panel Distribusi - Proyek STAN BintaroGedung02/10/2024 14:0102/10/2024 14:31OPEN
Pengadaan Alih Lisensi SAP ADHIKantor Pusat25/09/2024 10:3125/09/2024 11:01OPEN
Pengadaan Jasa Pengembangan Aplikasi Bimo 2.0Kantor Pusat03/10/2024 09:0103/10/2024 10:01OPEN

 

Info Lelang Telah Selesai

Nama PaketNominalPemenang LelangJenis Lelang
Konsultan Hukum555.000.000Tumbuan & PartnersTender Terbatas
Notaris99.345.000Ashoya RatamTender Terbatas
Percetakan150.960.000Global Fokus KaryatamaTender Terbatas
Renewal Autodesk AEC Collection (1 year)3.919.188.000PT SINERGI WAHANA GEMILANGTender Terbatas
Renewal Autodesk AEC Collection Trade-in (1 year)2.749.248.000PT EDPMEDIA MULTIMITRA PRIMANUSATender Terbatas
Autodesk AEC Collection New Subscription (1 year)192.862.500PT SINERGI WAHANA GEMILANGTender Terbatas
Reneweal Autodesk AutoCAD LT (1 year)329.059.500PT EDPMEDIA MULTIMITRA PRIMANUSATender Terbatas
Autodesk AutoCAD LT New Subscription (1 year)93.506.400PT SINERGI WAHANA GEMILANGTender Terbatas
JASA MANAGED OPERATION SAP - ADHI1.228.770.000PT SIGMA CIPTA CARAKATender Terbatas
Pengadaan Jasa Audit Resertifikasi Audit SNI ISO 9001, 45001 dan 14001194.250.000PT TUV NORD IndonesiaTender Terbatas
Konsultan RJPP6.549.000.000Price Water House CooperTender Terbatas
Pengembangan Aplikasi Whistle Blowing System (WBS) External46.620.000Teknologi Aplikasi SejahteraTender Terbatas
Pengadaan Paket Microsoft Office E1 - Visio - Power BI - 365 Apps ( 21 Juli 2024 new )1.338.549.000Multipolar TechnologyTender Terbatas
Pengembangan Aplikasi Audit Management System266.400.000PT. Tri Nindya UtamaTender Terbatas
Asesmen Risk Maturity Index (RMI) PT Adhi Karya (Persero) Tbk.257.520.000CV. KAP Heliantono dan RekanTender Terbatas
HVAC System Manyar Smelter Project - Steel Structure Works Area B (18-01-2024)815.850.000PT Catur Mitra TeknologiTender Terbatas
Power Construction Proyek Pusri IIIB - 17-01-20241.276.500.000PT. Matrix Jaya UnggulTender Terbatas
Construction 20kV Panel Proyek Pusri IIIB - 01-02-2024582.750.000PT. Berkah Cipta PersadaTender Terbatas
STEEL STRUCTURE FABRICATION PROYEK PLTMG SUMBAWA 2 - 15-12-20238.073.862.500PT Duta Hita JayaTender Terbatas
STEEL STRUCTURE SUPPLY PROYEK PLTMG TOBELO - 15-12-20237.220.994.000PT Duta Hita JayaTender Terbatas
WATER TREATMENT PLANT PROYEK PLTMG SUMBAWA 2 - 26-01-20241.332.000.000PT. Catur Prima TehnikTender Terbatas
WATER TREATMENT PLANT PROYEK PLTMG TOBELO - 26-01-20241.509.600.000PT. Catur Prima TehnikTender Terbatas
Construction Cable - Retender Proyek Pusri IIIB - 19-02-20241.134.125.850PT Multi Kencana NiagatamaTender Terbatas
GAS METERING PACKAGE PROYEK PLTMG SUMBAWA 2 - 19-02-20246.521.250.000PT. Ultra Delta MajuTender Terbatas
GAS METERING PACKAGE PROYEK PLTMG TOBELO - 19-02-20246.687.750.000PT. Ultra Delta MajuTender Terbatas
HV APPARATUS & SAS PROYEK PLTMG TOBELO - 27-02-202419.497.150.000PT. Hitachi Sakti Energy IndonesiaTender Terbatas
FIRE PROTECTION SYSTEM PROYEK PLTMG SUMBAWA 2 - 05-02-20248.214.000.000PT. Saberindo PacificTender Terbatas
FIRE PROTECTION SYSTEM PROYEK PLTMG TOBELO - 23-02-20248.325.000.000PT. Saberindo PacificTender Terbatas
FIRE PUMP PROYEK PLTMG SUMBAWA 2 - 20-03-20241.720.500.000PT. KSB IndonesiaTender Terbatas
FIRE PUMP PROYEK PLTMG TOBELO - 20-03-20241.720.500.000PT. KSB IndonesiaTender Terbatas
SPUN PILE SUPPLY PROYEK PLTMG TOBELO - 14-03-20248.736.132.456PT WIJAYA KARYA BETON, TbkTender Terbatas
SPUN PILE DRIVING PROYEK PLTMG TOBELO - 14-03-202421.439.605.600PT BERDIKARI PONDASI PERKASA, TbkTender Terbatas
AUXILIARY TRANSFORMER PROYEK PLTMG SUMBAWA 2 - 18-12-20232.193.360.000PT. Symphos ElectricTender Terbatas
150KV SWITCHYARD PACKAGE PROYEK PLTMG SUMBAWA 2 - 21-12-2319.258.500.000PT. Siemens Energy IndonesiaTender Terbatas
INSURANCE CAR PROYEK PLTMG TOBELO - 05-03-20241.165.500.000PT AON IndonesiaTender Terbatas
INSURANCE CAR PROYEK PLTMG SUMBAWA 2 - 05-03-20241.054.500.000PT AON IndonesiaTender Terbatas
GROUP AUXILIARY TRANSFORMER - ONAN ONLY COOLING RETENDER PROYEK PLTMG TOBELO - 08-03-20232.193.360.000PT. Symphos ElectricTender Terbatas
ROOFING & SIDING SUPPLY AND INSTAL PROYEK PLTMG SUMBAWA 2 - 08-03-20248.135.190.000PT Sunemas PerkasaTender Terbatas
ROOFING & SIDING SUPPLY AND INSTAL PROYEK PLTMG TOBELO - 08-03-20248.469.300.000PT Sunemas PerkasaTender Terbatas
TRANSPORTATION OF PC SPUN PILE PROYEK PLTMG TOBELO - 22-04-20244.494.390.000PT Total Movements InternationalTender Terbatas
Laydowns Electrical Cable Proyek Pusri IIIB - 22-05-2024387.125.051PT LSAG Cable IndonesiaTender Terbatas
Laydown 1 Temporary Proyek Pusri IIIB - 05-07-20241.326.450.000PT Resvara Balawan PrakasaTender Terbatas
TANK & VESSEL PROYEK PLTMG TOBELO - 27-05-202412.154.500.000PT Hydroraya Adhi PerkasaTender Terbatas
TANK & VESSEL FABRICATION & ERECTION PROYEK PLTMG SUMBAWA 2 - 27-05-20249.934.500.000PT Hydroraya Adhi PerkasaTender Terbatas
TANK & VESSEL PLATE SUPPLY PROYEK PLTMG SUMBAWA 2 - 29-05-20242.766.171.368PT Krakatau SteelTender Terbatas
MATERIAL TANK & VESSEL PROYEK PLTMG TOBELO - 29-05-20243.010.395.612PT Krakatau SteelTender Terbatas
EMERGENCY DIESEL GENERATOR PROYEK PLTMG SUMBAWA 2 - 21-06-2024632.700.000PT Arbas Mitra SejatiTender Terbatas
BLACK START DEISEL GENERATOR PROYEK PLTMG TOBELO - 21-06-2024632.700.000PT Arbas Mitra SejatiTender Terbatas
METALIC VALVES PROYEK PLTMG SUMBAWA 2 - 25-06-2024610.500.000PT Sinar Surya Timur TeknikTender Terbatas
METALIC VALVES PROYEK PLTMG TOBELO - 24-06-2024810.300.000PT Sinar Surya Timur TeknikTender Terbatas
SUPPLY ELECTRICAL CABLE PROYEK PLTMG TOBELO - 24-06-20242.580.545.760PT Jembo Cable IndonesiaTender Terbatas
SUPPLY ELECTRICAL CABLE PROYEK PLTMG SUMBAWA 2 - 25-06-20243.725.106.720PT Multi Kencana NiagatamaTender Terbatas
AIR COMPRESSOR PACKAGE PROYEK PLTMG SUMBAWA 2 - 08-07-20242.450.880.000PT Petrotec Air PoweTender Terbatas
AIR COMPRESSOR PACKAGE PROYEK PLTMG TOBELO - 08-07-20242.595.180.000PT Petrotec Air PoweTender Terbatas
TELCOM SYSTEM (VoIP,LAN,PA,INTERCOM, RADIO&CCTV) PROYEK PLTMG SUMBAWA 2 - 24-06-20244.708.620.000PT Megayasa Teknologi IndonesiaTender Terbatas
TELCOM SYSTEM (VoIP,LAN,PA,INTERCOM, RADIO&CCTV) PROYEK PLTMG TOBELO - 24-06-20243.903.870.000PT Megayasa Teknologi IndonesiaTender Terbatas
Material Plate (Carbon Steel) Proyek Pusri IIIB - 05-07-20242.968.575.876PT Krakatau Steel (Persero)Tender Terbatas
Concrete Supply Proyek Pusri IIIB - 25-01-202436.420.531.212PT Varia usaha betonTender Terbatas
Pekerjaan Parapet MB )+600 & MB 0+675 Proyek Tol Sigli Banda Aceh642.172.413Miska Cipta Mandiri, PTTender Terbatas
PEKERJAAN MARKA JALA TIPE A PEMBANGUNAN JALAN TOL BAYUNG LENCIR - TEMPINO SEKSI 12.662.230.283CV. CITRA SANDHYATender Terbatas
Pekerjaan Box Underpass STA 8+429 Proyek Tol Sigli - Banda Aceh1.772.527.365CV. PRASETIA JAYATender Terbatas
Pekerjaan Geomat dan Vegetasi Taplok Proyek Tol Sigli - Banda Aceh Seksi 1A7.948.219.380PT. GEOSINTETIK REKAYASA KONSTRUKSITender Terbatas
Pekerjaan Geomat dan Vegetasi Taplok Proyek Tol Sigli - Banda Aceh Seksi 1B6.743.574.120PT. GEOSINTETIK REKAYASA KONSTRUKSITender Terbatas
Pekerjaan Atap11.433.000.000PT. Anugerah wijayatrisnaTender Terbatas
Pekerjaan Elektrikal Proyek PLN Depok & Ungaran6.876.450.000PT SURYA ELEKTRINDO SWASTIKATender Terbatas
Pekerjaan Sistem Keamanan Proyek PLN Depok & Ungaran7.770.000.000PT TETRASETIA INDONESIATender Terbatas
Pekerjaan Secondary Skin Proyek BDK Denpasar1.343.889.632PT NATUNA CEMERLANGTender Terbatas
Pekerjaan BAS Proyek PLN Depok & Ungaran4.440.000.000PT INTISAR SOLUZINDOTender Terbatas